Atlanta, GA
Scope of Services
Project Management
Project Details
900,000 sf
New Headquarters Build-Out
Design Features
The Atlanta Metro Tech Center’s design and construction was fast – tracked so that the first tenant could occupy 100,000 sf in 8 months from the start of the design. The project also included the design and construction of approximately 2 miles of fiber optic ducts installed in the public right-of-ways as well as the design and construction of a substation designed specifically to serve the building.
Project Team
Architect: EYP Architecture & Engineering
Contractor: Holder Construction